Commercial charging is a service-capacity question before it is an equipment question. A property with a 400-amp service and a full tenant load cannot host six Level 2 ports without either a load-management system or new service from the utility, and finding that out after the chargers are ordered is how these projects stall. We start with a load study on the existing service, then work backwards from how many vehicles actually need to charge and for how long. Overnight tenant parking and a two-hour customer turnover are different problems with different answers. Boston property owners also have a funding route most installers do not walk them through. MassEVIP grants cover charging at workplaces, fleets, multifamily buildings and public sites, and the utilities run make-ready programs that pay for the infrastructure side rather than the hardware. Both need documentation filed in a particular form, and both have to be sequenced before the install rather than claimed afterwards. We prepare that package as part of the scope. What you receive is a design that names the port count, the circuit layout, the metering arrangement, the permit path through the local wiring inspector, and the funding you qualify for, with the inspection sequence written down.
The sequence on a commercial job runs: load study, port count and layout, grant and make-ready filing, permit, install, inspection, commissioning. Metering gets decided early, because whether the building or the driver pays changes the wiring. You get the load study, the single-line drawing, the equipment specification, the permit number, the inspection sign-off and the commissioning report. If the utility has to touch the service, we tell you that in week one rather than week six.

Ports sized to the building service, not to the parking count you hoped for.
We file with the utility and track the service work against your build schedule.
Equipment specifications and cost breakdowns in the form the grant program wants.
Ten services, from a single garage circuit to a commercial lot. The install work splits by what the panel can carry and by who owns the parking. Repair and maintenance keep an existing charger delivering full current instead of quietly derating.

Outside Boston we work in Cambridge, Somerville, Newton, Quincy and Medford. Each one files electrical permits through its own office and sits in its own utility territory, so the rebate route and the inspection timing shift from city to city. We confirm both before the first invoice.
Frequently Asked Questions
EV Charging can be complex, and we’re here to provide answers to common questions. Here are some frequently asked questions from our clients.
Most Boston home installs land somewhere between roughly $1,700 and $4,000, and the spread is almost entirely about the panel and the distance. A charger mounted beside an existing panel with spare capacity sits at the bottom of that range; a run to a detached garage, or one that needs a panel upgrade first, sits at the top. We price after we have looked at the panel and the parking spot, because a number given before that is not a quote.
Yes. A new charger circuit is electrical work, and Massachusetts requires that it be filed with the municipal wiring inspector before it gets energized. We pull the permit under our license and meet the inspector for the rough and final. If an installer offers to skip that step, the circuit never gets inspected and the paperwork you need for a rebate does not exist.
Not unreasonably. The Massachusetts Right-to-Charge law limits what a condo association can refuse when a unit owner wants a charger at their own parking space, though the association can still set reasonable conditions about routing, metering and insurance. What actually stalls these projects is incomplete paperwork rather than a flat refusal. We prepare the scope drawing, the equipment specification and the electrical detail the board needs to vote on.
Sometimes, and it comes down to the load calculation rather than the age of the panel. A 100-amp service with electric heat or a large air conditioner often has no room for a 40-amp charger circuit, while another 100-amp house has plenty. We run the calculation during the site visit. Where the load is tight, a load-management device can occasionally solve it for less than a service upgrade would.
The state runs MOR-EV, the utilities run charger and make-ready rebates through Mass Save, and MassEVIP grants cover charging at multifamily buildings, workplaces, fleets and public sites. The federal residential charger credit ended on June 30, 2026, so a charger placed in service after that date does not qualify. Amounts and eligibility change, so we confirm what your address and utility actually qualify for before you commit to equipment.
The wiring on a straightforward residential install is usually a single day. What sets the overall timeline is the permit and inspection sequence, equipment lead time, and any utility work if the service itself has to change. A condo or commercial project adds the approval step ahead of all of that. We give you the sequence in writing, with the inspection date, so you know what is waiting on us and what is waiting on somebody else.
Commercial pricing is driven by the service capacity and the trenching, not by the chargers. A pair of ports beside an existing panel in a parking structure is a modest job; the same two ports at the far end of a lot, with conduit under pavement, can cost several times that. We quote after the load study, and we tell you which parts of the number the grant programs can offset.
That comes out of the load calculation on your existing service and the demand profile of the tenants. Load management can often double the port count on the same service by sharing current between vehicles, which matters when cars sit parked overnight. Where the vehicles turn over every hour or two, sharing does not work and the honest answer is either fewer ports or new service.
Not necessarily, and the decision should be made before the wiring is designed. Some Boston buildings absorb the cost as an amenity, some submeter, and some use networked units that handle payment. Networked hardware adds a subscription and a data connection to the project, so it is worth deciding early whether you actually need it.
Some of it, briefly. Conduit runs and any core drilling get staged so that sections of the lot close in sequence rather than all at once. We give you a phasing plan with the quote, and the inspection dates, so you can warn tenants once instead of three times.
Scope Your Boston Commercial Charging Project
We pride ourselves on delivering great results and experiences for each client. Hear directly from home and business owners who’ve trusted us with their EV Charging needs.
Ready to hear more about expert services at Boston EV Charging Co.?
Contact us today to receive a detailed, no-obligation quote.

Serving Back Bay, Beacon Hill, South Boston, Dorchester, Jamaica Plain, Roslindale & Greater Boston
Mon–Fri 8AM–6PM | Sat 9AM–3PM | Sun Closed