A Wall Connector is a straightforward unit to install and an easy one to install badly. The two decisions that matter are the circuit and the position. A 60-amp circuit delivers the unit's full rate, but plenty of Boston panels will only support 40 or 50 amps once the rest of the house is counted, and the unit is configured at commissioning to match what was actually installed. Setting that correctly is part of the job; leaving it at a default the circuit cannot support is how nuisance tripping starts. Position matters because the cable has a fixed length and cars park where they park. A unit mounted on the wrong side of a garage, or beside the panel rather than beside the parking space, produces a cable stretched across a walkway for the next decade. We work out the mounting point from where the car sits and which side its charge port is on, then route the circuit to that. Two-car households have an extra option worth knowing about: several connectors can share a single circuit, alternating current between vehicles overnight. That often avoids a service upgrade entirely, at the cost of slower simultaneous charging. We commission the unit, connect it to your network if you want the app features, and confirm a full session before we leave.
The install runs as one visit in most homes: permit filed, circuit run, unit mounted, commissioning and configuration to the installed circuit, then a verified charge session. Inspection follows on the wiring inspector's schedule. You get the permit number, the configured current setting written down, and the inspection record. If you buy the hardware yourself, order it before the visit and we will confirm the model is the one the scope was priced around, since the mounting bracket and the cable length differ between generations of the same unit.

Installed and commissioned, with the circuit sized to what your panel carries.
Hardware plus the install, priced separately so you can see both.
Multiple connectors sharing one circuit where the service cannot carry two.
Ten services, from a single garage circuit to a commercial lot. The install work splits by what the panel can carry and by who owns the parking. Repair and maintenance keep an existing charger delivering full current instead of quietly derating.

Outside Boston we work in Cambridge, Somerville, Newton, Quincy and Medford. Each one files electrical permits through its own office and sits in its own utility territory, so the rebate route and the inspection timing shift from city to city. We confirm both before the first invoice.
Frequently Asked Questions
EV Charging can be complex, and we’re here to provide answers to common questions. Here are some frequently asked questions from our clients.
Most Boston home installs land somewhere between roughly $1,700 and $4,000, and the spread is almost entirely about the panel and the distance. A charger mounted beside an existing panel with spare capacity sits at the bottom of that range; a run to a detached garage, or one that needs a panel upgrade first, sits at the top. We price after we have looked at the panel and the parking spot, because a number given before that is not a quote.
Yes. A new charger circuit is electrical work, and Massachusetts requires that it be filed with the municipal wiring inspector before it gets energized. We pull the permit under our license and meet the inspector for the rough and final. If an installer offers to skip that step, the circuit never gets inspected and the paperwork you need for a rebate does not exist.
Not unreasonably. The Massachusetts Right-to-Charge law limits what a condo association can refuse when a unit owner wants a charger at their own parking space, though the association can still set reasonable conditions about routing, metering and insurance. What actually stalls these projects is incomplete paperwork rather than a flat refusal. We prepare the scope drawing, the equipment specification and the electrical detail the board needs to vote on.
Sometimes, and it comes down to the load calculation rather than the age of the panel. A 100-amp service with electric heat or a large air conditioner often has no room for a 40-amp charger circuit, while another 100-amp house has plenty. We run the calculation during the site visit. Where the load is tight, a load-management device can occasionally solve it for less than a service upgrade would.
The state runs MOR-EV, the utilities run charger and make-ready rebates through Mass Save, and MassEVIP grants cover charging at multifamily buildings, workplaces, fleets and public sites. The federal residential charger credit ended on June 30, 2026, so a charger placed in service after that date does not qualify. Amounts and eligibility change, so we confirm what your address and utility actually qualify for before you commit to equipment.
The wiring on a straightforward residential install is usually a single day. What sets the overall timeline is the permit and inspection sequence, equipment lead time, and any utility work if the service itself has to change. A condo or commercial project adds the approval step ahead of all of that. We give you the sequence in writing, with the inspection date, so you know what is waiting on us and what is waiting on somebody else.
It can run on anything from a 15-amp to a 60-amp circuit, and the unit is configured at commissioning to match. A 60-amp circuit gives the full charge rate, but the load calculation on your service decides whether that is available. Most Boston homes end up on 40 or 50 amps, which still adds far more range overnight than any driver uses in a day.
With an adapter, generally yes, and how cleanly it works depends on the vehicle. If the household has mixed vehicles it is worth comparing against a standard connector unit, which plugs into anything without adapters. We will tell you which we would install given what you actually drive.
Yes. Multiple units can be linked to share a single circuit, taking turns rather than drawing at once. For a two-car household that parks overnight this is usually the cheaper answer than upgrading the service, since both cars have eight hours to split between them.
Close enough that the cable reaches the car's charge port without tension and without crossing a walkway, which often means a different wall than the panel is on. We decide it from where the car parks and which side the port is on, then plan the conduit route to suit. Getting this wrong is the most common complaint we hear about other installs.
Install Your Wall Connector in Boston
We pride ourselves on delivering great results and experiences for each client. Hear directly from home and business owners who’ve trusted us with their EV Charging needs.
Ready to hear more about expert services at Boston EV Charging Co.?
Contact us today to receive a detailed, no-obligation quote.

Serving Back Bay, Beacon Hill, South Boston, Dorchester, Jamaica Plain, Roslindale & Greater Boston
Mon–Fri 8AM–6PM | Sat 9AM–3PM | Sun Closed